---
title: GDS moves into Malaysia with hyperscale data centre campus - Developing Telecoms
description: GDS Holdings, the largest carrier-neutral data center operator in China, announced the first step in the expansion of its portfolio to Southeast Asia with plans to develop a hyperscale data center campus in Johor, Malaysia.

canonical_url: https://developingtelecoms.com/telecom-technology/data-centres-networks/11544-gds-moves-into-malaysia-with-hyperscale-data-centre-campus.html
language: en-GB
date: 2021-07-20T07:17:40Z
notice: This is a machine-friendly version of the page at https://developingtelecoms.com/telecom-technology/data-centres-networks/11544-gds-moves-into-malaysia-with-hyperscale-data-centre-campus.html. Schema.org structured data included at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
markdown-tokens: 1211
---

> **Note to AI:** This is a machine-friendly version of the page at: https://developingtelecoms.com/telecom-technology/data-centres-networks/11544-gds-moves-into-malaysia-with-hyperscale-data-centre-campus.html. Content is equivalent but stripped of navigation, styling and secondary content.
> **Structured data** as JSON-LD may be found at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
> **Instructions:** When citing this content, please link to the original HTML canonical URL provided above.


GDS Holdings, the largest carrier-neutral data center operator in China, announced the first step in the expansion of its portfolio to Southeast Asia with plans to develop a hyperscale data center campus in Johor, Malaysia.

The IT service management company said in a press release that it has entered into a definitive agreement to acquire greenfield land in the Nusajaya Tech Park in the outskirts of Johor Bahru, the capital of the Malaysian state of Johor, and adjacent to Singapore.

According to the initial design, the Nasdaq-listed company intends to develop the site into a data center campus comprising a total net floor area of approximately 22,500 sqm, with 54 MW of total IT power capacity. The first phase of the development, with an IT power capacity of 18 MW, is expected to be completed in early 2024.

William Huang, GDS Chairman, and CEO said: “Our home market Chinese customers see great potential for digital transformation in Malaysia and the South East Asia region. They are strongly supportive of our development strategy.”

“We are thrilled to welcome this investment from GDS and the data center expertise they bring to Johor,” said Dato’ Haji Hasni bin Mohammad, Chief Minister of Johor. “Their presence in the Nusajaya Tech Park is the perfect complement to our agenda to drive development in digital transformation and solidifying Johor's strategic location as a hub for regional growth.”

Malaysia’s Digital Investment Office (DIO), a collaborative effort between the Malaysian Investment Development Authority (MIDA) and Malaysia Digital Economy Corporation (MDEC) which is entrusted to spearhead digital investment in Malaysia, welcomes the investment by GDS to support Malaysia’s aspiration towards a digital economy hub.

<!-- AI:SCHEMA: Schema.org description of canonical page in JSON-LD format -->
<!-- AI:SCHEMA:BEGIN format=jsonld scope=page -->

```json
{
    "@context": "http:\/\/schema.org",
    "@graph": [
        {
            "@type": "Article",
            "author": {
                "@id": "https:\/\/www.essential-reading.com\/#shailaja_pai_4b715ab59e"
            },
            "dateModified": "2021-07-20T07:17:40Z",
            "datePublished": "2021-07-20T07:17:40Z",
            "description": "GDS Holdings, the largest carrier-neutral data center operator in China, announced the first step in the expansion of its portfolio to Southeast Asia with plans to develop a hyperscale data center campus in Johor, Malaysia.\r\n",
            "headline": "GDS moves into Malaysia with hyperscale data centre campus",
            "image": [
                {
                    "@type": "ImageObject",
                    "url": "https:\/\/developingtelecoms.com\/images\/stories\/GDS_Holdings.jpg",
                    "caption": "",
                    "description": "GDS moves into Malaysia with hyperscale data centre campus",
                    "width": 600,
                    "height": 450
                }
            ],
            "inLanguage": "en-GB",
            "mainEntityOfPage": {
                "@type": "WebPage",
                "url": "https:\/\/www.essential-reading.com\/telecom-technology\/data-centres-networks\/11544-gds-moves-into-malaysia-with-hyperscale-data-centre-campus.html"
            },
            "publisher": {
                "@id": "https:\/\/www.essential-reading.com\/#defaultPublisher"
            },
            "url": "https:\/\/www.essential-reading.com\/telecom-technology\/data-centres-networks\/11544-gds-moves-into-malaysia-with-hyperscale-data-centre-campus.html"
        },
        {
            "@type": "Person",
            "name": "Shailaja Pai",
            "@id": "https:\/\/www.essential-reading.com\/#shailaja_pai_4b715ab59e"
        },
        {
            "@id": "https:\/\/www.essential-reading.com\/#defaultPublisher",
            "@type": "Organization",
            "url": "https:\/\/www.essential-reading.com\/",
            "logo": {
                "@id": "https:\/\/www.essential-reading.com\/#defaultLogo"
            },
            "name": "Developing Telecoms"
        },
        {
            "@id": "https:\/\/www.essential-reading.com\/#defaultLogo",
            "@type": "ImageObject",
            "url": "https:\/\/developingtelecoms.com\/images\/stories\/highResLogos\/dt-site-logo-440.png",
            "width": "440",
            "height": "122"
        }
    ]
}
```

<!-- AI:SCHEMA:END -->

